
Redefine existing bed edges or deep edge non-existent bed lines. Install mulch once soil temperatures have warmed up. Mulch should be no more than 3-4” thick. Apply pre-emergent to lawns and beds. Begin mowing as grass starts to grow — usually mid-April. Activate irrigation systems Plant summer annuals (after threat of frost — usually May 15th) Fertilize lawns.